Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 8, 2023

December 8, 2023

January 24, 2024

Multiple Locations

Site Work

No Information to Display

$600,000.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Brush Prairie, WA

Subscribe to View Full Documents

Involves replacing the existing breakaway cable terminals with current crash tested MASH end terminals traffic control and other work, Involves 26 items and 30 working days. Work class 11. County Clark County Cowlitz County Lewis County Estimated value $500,000 - $600,000 Contact Mike Briggs Project Engineer swgorgequestions@wsdot.wa.gov WADOT - I-5, I-205, SWR Breakaway Cable Terminal Replacement Freeways 21-23 Re-Advertise *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.