Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
November 7, 2023
December 7, 2023
March 7, 2024
5800 Fleur Dr
Renovation
No Information to Display
$450,000.00
Public - City
5800 Fleur Dr, Des Moines, IA
This project involves all elements in the construction of new foundations and footings for future Passenger Loading Bridges (PLB) and fixed walkways. Scope of work includes new foundations for rotundas and fixed walkways, pavement markings to realign gates, and the associated demolition and site improvements. The Work generally consists of: 1. Gate C1 Foundation 2. Gate C5A Foundation 3. Gate A4A Foundation 4. Gate A5B Foundation 5. Apron Remarking Each Bidder shall accompany its bid with bid security as defined in Iowa Code Section 26.8, as security that the successful Bidder will enter into a Contract for the work bid upon and will furnish after the award of Contract corporate Surety Performance and Payment Bond(s), in a form acceptable to the Board, for the faithful performance of the Contract, in an amount equal to one hundred percent (100%) of the amount of the Contract. The Bidder's security shall be in the amount of ten (10%) percent of the Bid and shall be in the form of a cashier's check or a certified check drawn on an FDIC- insured bank in Iowa or on an FDIC-insured bank chartered under the laws of the United States, or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States; or a Bid Bond on the form provided in the Contract Documents with corporate Surety satisfactory to the Board. The bid shall contain no condition except as provided in the specifications. Performance, Payment, and Maintenance Bonds. Each successful Bidder will be required to furnish corporate Surety Bonds in an amount equal to one hundred percent (100%) of its Contract price. Said Bonds shall be issued by a responsible Surety approved by the Des Moines Airport Authority and shall guarantee the faithful performance of the Contract and the terms and conditions therein contained and shall guarantee the prompt payment of all material and labor, and protect and save harmless the Des Moines Airport Authority from claims and damages of any kind caused by the operations of the Contract and shall also guarantee the maintenance of the improvement caused by failures in materials and construction for a period of two (2) years from and after acceptance of the Contract Work on the improvements shall be commenced any time after a written Notice to Proceed is issued and shall be completed as stated below. The Notice to Proceed will be issued after the preconstruction conference, which is expected to occur on November 17, 2023 The Engineer's opinion of the probable construction cost for the Work is between $400,000 and $450,000. This project Package 1 Foundation shall be fully completed no later than March 7, 2024 The Des Moines Airport Authority reserves the right to reject any or all bids, to waive informalities, and to enter into such contract or contracts as it shall deem to be in the best interest of the Authority *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Any persons who wish to review the project site may coordinate a site visit with Bryan Belt at (515) 256-5160.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Des Moines, IA
Bid Date: Oct 23 2023
Des Moines, IA
Bid Date: Nov 07 2023
Des Moines, IA
Bid Date: Oct 24 2023
Des Moines, IA
Bid Date: Nov 08 2023
Des Moines, IA
Bid Date: Nov 16 2023
Des Moines, IA
Bid Date: Nov 07 2023
Des Moines, IA
Bid Date: Jun 03 2021
Des Moines, IA
Bid Date: Oct 27 2023
Des Moines, IA
Bid Date: Oct 25 2023
Des Moines, IA
Bid Date: Nov 21 2023
Des Moines, IA
Bid Date: Nov 07 2023
Des Moines, IA
Bid Date: Oct 17 2023
Des Moines, IA
Bid Date: Oct 26 2023
Des Moines, IA
Bid Date: Nov 02 2023
Des Moines, IA
Bid Date: Oct 31 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
