Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 10, 2023

December 11, 2023

December 11, 2024

Multiple Locations

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Surrey, BC

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

CCTV inspection has revealed defects in 37 mains in the City of Vancouver. The pipes vary in size from 200mm to 900mm in diameter, convey sanitary, storm or combined effluents, and are comprised of reinforced concrete, vitrified clay pipe, or PVC. The pipe defects include (but are not limited to) fractures, breaks, cracks, holes, exposed aggregate, and obstructions. The defects in the sanitary and storm pipes, if left unrepaired may contribute to unwanted inflow and infiltration and increase the risk of a collapse, or sinkhole. Anchor rods and other obstructions in the mains, if not removed, may cause a backup, interrupting storm service to the adjacent properties and lane catch basins. This work will be separated into 2 phases: Phase 1 will include 6 sewer mains for full CIPP relining (from MH to MH) and 14 sewer mains for partial CIPP relining. Phase 2 will include up to 6 sewer mains for full CIPP relining (from MH to MH) and up to 11 sewer mains for partial CIPP relining. Phase 2 will be contingent on the completion of and the work quality of Phase 1. are expected to submit following documents along with their proposals: Latest Resin Product Sheet, Grout Product Sheet, Liner Product Sheet, Testing Results A sample of completed work reports, CCTV inspection and video for both Full CIPP and Partial CIPP works Question Deadline 11/03/2023 at 3:00 PM PT The term of any Agreement is expected to be a one (1) -year period.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects