Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 9, 2023

January 5, 2024

December 31, 2024

Multiple Locations

Site Work

No Information to Display

$1,500,000.00

Public - City

img_map_placeholder

Multiple Locations, Birmingham, IA

Subscribe to View Full Documents

Est. Completion Date: Dec. 31, 2024 Proposed Water System Improvements CDBG #23-WS-015 - SRF #FS-89-22-DWSRF-039- Birmingham, Iowa - 2023 - The project includes the removal of an existing 30,000-gallon water tower from the intersection of E. Main Street and South Cross Street, the construction of a 75,000-gallon water tower in the same location with remote water level control, approximately 350 feet of 8-inch water main along South Cross Street adjacent to the tower, and other improvements usually associated with water storage and water main projects.

10 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects