Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 14, 2023

December 14, 2023

August 28, 2024

1623 Hospital Loop

Demolition, New Construction, Site Work

No Information to Display

$400,000.00

Public - Federal

img_map_placeholder

1623 Hospital Loop, Owyhee, NV

Subscribe to View Full Documents

Generally, the Work covered by the Plans and Specifications for the New Town Subdivision Lift Station Replacement consists of the materials, labor, tools, and equipment required for the construction of a sanitary sewer lift station. The Work includes the removal and replacement of a sanitary sewer lift station, one sanitary manhole, approximately 170 LF of gravity sanitary sewer, approximately 60 LF of sanitary sewer force main, and other incidentals as necessary to complete the project. Details of the construction are included in the Drawings and Project Manual. All Bids are to be submitted on the basis of cash payment for the Work and Materials necessary to complete the project. Each bid must be accompanied by a separate envelope containing the contractor's license and bid security. The bid security must be in a sum equal to five percent of the full amount of the bid and must be in the form of a bidder's bond. A bidder's bond must be executed by the bidder as principal and by a surety, conditioned that if the principal's bid is accepted and the contract awarded to the principal, the principal, within ten days after notice of the award, shall execute a contract in accordance with the terms of the bid and the bid bond and any condition of the governing body. A countersignature of a bid bond is not required under this section. If a successful bidder does not execute a contract within the ten days allowed, the bidder's bond must be forfeited to the Owner and the project awarded to the next lowest responsible bidder. Bidders must be licensed for the full amount of the bid. The Owner reserves the right to hold all Bids for 60 days, to reject any or all Bids, to waive any informality or irregularity in any Bid, to accept the Bid deemed in the best interest of the Owner, and to rebid the project until a satisfactory bid is received. There shall be endorsed upon the outside of the envelope containing the Bid, the following: 1. "Shoshone-Paiute Tribes, New Town Subdivision Lift Station Replacement - BID ENCLOSED" 2. The name of the person, firm, corporation, or joint venture submitting the Bid. 3. The Bidder's Contractor's License or Contractor's License Renewal Number. 4. Acknowledgement of the Addenda, if any. Any deficient Bid received will be resealed and returned to the Bidder immediately. All Work shall be substantially complete by July 31, 2024 and shall be complete and ready for final payment in accordance with the General Conditions by August 28, 2024. Should the Contractor fail to complete its obligations under the Contract within the time required herein or within such extra time as may have been granted by formal extensions of time approved by the Owner, there will be deducted from any amount due to the Contractor the sum of $1,000 per day for each and every calendar day that the completion of the Work is delayed. The Contractor and his Surety will be liable for any excess. Such payment will be as and for liquidated damages and not as a penalty. Potential bidders may contact Ackerman-Estvold at (208) 853-6470 with any questions.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.