Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 9, 2023

December 12, 2023

April 11, 2024

To Be Determined

Renovation, Site Work

No Information to Display

$1,045,350.00

Public - City

img_map_placeholder

To Be Determined, Hammond, LA

Subscribe to View Full Documents

A performance BOND and a payment BOND each in the amount of one-hundred percent (100%) of the CONTRACT PRICE, with a corporate surety approved by the OWNER, will be required for the faithful performance of the contract. The OWNER reserves the right to reject any BID if the evidence submitted by, or investigation of, such BIDDER fails to satisfy the OWNER that such BIDDER is properly qualified to carry out the obligations of the Agreement and to complete the WORK contemplated therein. Attorneys-in-fact who sign BID BONDS or payment BONDS and performance BONDS must file with each BOND a certified and effective dated copy of their power of attorney. Each BID must be accompanied by a BID bond payable to the OWNER for five percent (5%) of the total amount of the BID. As soon as the BID prices have been compared, the OWNER will return the BONDS of all except the three lowest responsible BIDDERS. Removal of (2) existing mechanical screens in the East Headworks and replacing with (1) new mechanical screen; removal of (1) existing manual bar screen and replacing with (1) mechanical screen in the West Headworks; 25 SY of 8" thick concrete dumpster pad; 100 LF of chain link fencing; 150 SY of slab sod; 175 CY of backfill; 20 tons of Limestone; miscellaneous clearing; demolition, and sitework; and related work as called for on the drawings, indicated on the Bid Form, or reasonably implied. Contract Term: 120 calendar days Construction

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects