Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
October 26, 2023
November 27, 2023
No Information to Display
11220 S Wallace St
Renovation
No Information to Display
$225,000.00
Public - City
11220 S Wallace St, Chicago, IL
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Questions Due Date: Oct 13th 2023, 11:30 AM CDT Various Trades PLA for work over 25K Provide Labor and Materials: Relocate Furniture, Remove Existing Flooring, Apply Skim Coat, Install commercial grade 12x12 VCT, and Reinstall Furniture in its Original Location for approximately 2,250 sq. ft. which includes the Front Reception Area, Main Office, and Conjoining Offices during Christmas Break 1) Uninstall and Relocate Office Furniture to Designated Location 2) Remove Existing Flooring, Sub-Flooring, Quarter-Rounds, and Thresholds 3) Furnish and install Skim Coat 4) Furnish and install commercial grade 12x12 VCT 5) Strip and rewax floor with at least three coats of wax applied after install. 6) Install Quarter-Rounds 7) Install and Replace Furniture in its Original Location 8) Contractor to secure necessary permits. 9) Contractor to field verify dimensions and specifics of all projects listed above before placing bid. 10) Not responsible for contractor errors as a result of non-field verification. 11) Materials and installation must comply with CPS Standards and Specifications as listed on a) SECTION 09 30 00 TILING 12) Secure job site overnight if work is not completed in one day. 13) If building or CPS properties are damaged during construction, contractor to replace and/or repair as necessary. 14) Provide necessary labor and materials to fix/correct issues preventing any or all of the projects to be marked as completed. 15) All work shall be coordinated with the Board authorized representatives to complete in an agreed upon time frame. 16) Contractor is to remove and dispose of materials torn out and any construction debris. 17) All trash must be removed off-site by contractor. 18) Clean the surrounding area and make sure all is swept of debris. 19) All questions/requests must be received two (2) business days prior to bid closing.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Chicago, IL
Bid Date: Oct 10 2023
Chicago, IL
--
Chicago, IL
Bid Date: Oct 24 2023
Chicago, IL
Bid Date: May 26 2023
Chicago, IL
--
Chicago, IL
Bid Date: Nov 02 2023
Chicago, IL
--
Chicago, IL
Bid Date: Oct 19 2023
Chicago, IL
Bid Date: Oct 10 2023
Chicago, IL
Bid Date: Oct 10 2023
Chicago, IL
Bid Date: Oct 24 2023
Chicago, IL
Bid Date: Oct 17 2023
Chicago, IL
Bid Date: Oct 17 2023
Chicago, IL
Bid Date: Oct 17 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
