Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 26, 2023

November 25, 2023

October 31, 2024

520 N 47th St

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - Federal

img_map_placeholder

520 N 47th St, Grand Forks, ND

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The period of performance is anticipated to be 25 November 2023 to 31 October 2024 Written questions must be furnished to the Government no later than 23 October 2023 at 10:00am local time, in order to ensure a timely response is provided by the solicitation closing date. All questions are to be submitted in writing at the time indicated in the solicitation or they may not be addressed before solicitation closing date; therefore, contractors are advised to submit questions as soon as possible. Please provide your company name, telephone, point of contact, e-mail address, and solicitation number on all questions. The Government will respond to questions via the issuance of an amendment which incorporates the question and the Government's response. The contractor shall remove snow and ice, including drifts or piles, from all roadways, parking lots, loading bays / docks, and sidewalks as shown on attached facility map(s). Multiple snow/ice removals may be required each day. Contractor shall treat cleaned surfaces skid free by applying a contractor furnished sand, salt or approved chemical, (Salt/Sand mixture or Chemical treatment must comply with State and Local Department of Transportation Requirements). Sidewalks to be kept in slip free condition. Snow plowing and sidewalk snow removal will normally be ordered at or near the end of a snowfall or, in a continuing snowfall. However; determination of when to order services rests solely with the COR or DR. Note that any drawings or maps provided to the Contractor, either before or after the contract is awarded, are for reference purposes only and may not be to scale. Any square footage, or other measurement provided, may be an approximation. It is the sole responsibility of the Contractor to determine or verify the actual site conditions and measurements

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects