Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 23, 2023

February 29, 2024

August 29, 2025

Multiple Locations

Site Work

No Information to Display

$12,000,000.00

Public - City

img_map_placeholder

Multiple Locations, Columbus, IN

Subscribe to View Full Documents

Final Questions due send to Jason Larrison, J.S. Held, via email jlarrison@jsheld.com Shortlist Announced On or before October 27, 2023 Interviews October 30 - November 1, 2023 Informational Meeting November 14, 2023 (Joint Commission and Council Meeting) CMc Award Recommendation November 20, 2023 (Redevelopment Commission Meeting) CMc Award Target Before December 31, 2023 Construction Begins Before March 1, 2024 Proposer shall submit twelve (12) paper copies of their response along with one electronic version via flash drive. Emailed submissions will not be accepted. The response submittal must be received no later than the date and time listed above. The submittal shall include the following components, submitted in this order. The total submission shall not exceed 22 pages (including cover letter and cover page, excluding tabs). All responses must be submitted in 8 1/2" x 11" format, paginated, tabbed with the section titles listed below, bound with spiral binding and printed double sided. The City of Columbus reserves the right to reject any or all responses and to waive any informalities or irregularities in any of the responses. Project Description In 2020, the City engaged Hitchcock Design Group to provide construction documents for in-river and riverfront redevelopment, which will be completed by November 2023. The City received approval from the Indiana Department of Natural Resources in 2021 and the Indiana Department of Environmental Management and the US Army Corps of Engineers in 2023. At this time, the City anticipates funding largely through cash reserves, supported by TIF. The Construction Delivery Method is expected to be Construction Manager as Constructor (CMc) (Indiana Code Section 5-32-2-5). The project will also be supported by READI grants, Next Level Trail grants, donations, and other funding mechanisms. The City wishes to engage a CMc to complete the following scope of work for this project, estimated at approximately $14m total project budget, of which approximately $12m is construction costs. Major Site Elements: o Low Head Dam: Removal of the concrete encased stone dam o Riffle: Installation of a stone riffle across approximately 2/3's of the river width o In-Water Recreation: Installation of a white water-style recreation channel across approximately 1/3 of the river width o Riverbank reinforcement o Extension of the People Trail, Columbus's greenway system o Two access points for water recreation o Riverfront amphitheater area o Landscaping and signage o Interpretive signage for the historic low head dam o Site preparation for site access and staging o Site Description o The Site is located within the downtown area. o The Site is in a Tax Increment Financing (TIF) area. o All project approvals are through the Columbus Redevelopment Commission and Columbus City Council. o The design team is in-place and construction documents are 90% complete. The construction documents have been approved by the various state and federal regulatory agencies and must be followed. Modifications to the plans must be approved by the USACE. CMc Scope of Work Provide all standard CMc services outlined in a typical Owner/Construction Manager as Constructor A133-2009 Contract. If additional services are anticipated by your team, please outline them in your proposal, as well as associated costs. The selected CMc will be required to furnish an agreement including the City of Columbus's standard contract terms. In the Proposer's response, each Proposer must affirm their ability to meet these terms shall be acknowledged in their proposal. The City of Columbus intends to establish a Guaranteed Maximum Price through the CMc contract. The intent is to establish a GMP at the earliest date possible. In no case shall this be later than after bids have been received from first-tier subcontractors and prior to construction commencing. The GMP will also identify a detailed construction schedule and the required date of substantial completion. The Redevelopment Commission encourages XBE participation, including all minority, women, and veteran owned businesses. During the project, the CMc is required to submit documentation and follow regulations associated with: READI grants, Next Level Trails grants, USACE permits, IDEM permits, DNR permits, and INDOT permits.

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects