Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

October 30, 2024

August 2, 2027

1 Buffington St

Addition, Demolition, Renovation, Site Work

No Information to Display

$25,000,000.00

Public - Federal

img_map_placeholder

1 Buffington St, Watervliet, NY

Our team is requesting plans for this project.

Subscribe to View Full Documents

Radial Forge Infrastructure. New and upgraded infrastructure is necessary for a new radial forge to be located in Building 135 at Watervliet Arsenal (WVA) in Watervliet, New York. The radial forge infrastructure project is one component of a larger comprehensive plan for WVA to replace the existing circa 1970 SX-55 Rotary Forge with an RX-70 Radial Forge. WVA is contracting directly with an equipment manufacturer to design and install the forge equipment and foundation. The Radial Forge requires new and upgraded infrastructure to function including process water, compressed air, power and data. WVA also requires infrastructure for operations including domestic water for washdown, drainage from the forge basement, dust/exhaust extraction for optimal working conditions, lighting in the forge basement, and other utility infrastructure improvements in and around Building 135. Work may include but is not limited to infrastructure demolition work, improvements, installation of an electrical substation, installation of new power distribution equipment to deliver power to the new equipment, installation of a new baghouse and associated ductwork, installation of a new cooling tower and associated pumps and piping, installation of a standalone control system for the infrastructure, installation of a standalone compressed air system, expansion and renovation of an existing control tower, architectural upgrades, life health and safety upgrades, installation of limited fire alarm and fire protection service, restoration of disturbed areas, and commissioning of all installed systems under the USACE contract. Extensive coordination throughout the life of the project with the equipment manufacturer, equipment installer, WVA, and USACE will be required. The of the project is between $10 million to $25 million. of construction will be approximately 1005 calendar days after Notice to Proceed. Notice to Proceed is anticipated to occur in APRIL 2023. The Method of Contractor Selection has not been determined at this Time *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.