Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 1, 2023

January 1, 2024

December 31, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$13,800,000.00

Public - City

img_map_placeholder

Multiple Locations, Cold Spring, MN

Subscribe to View Full Documents

Electronic Bids will be received for the furnishing of all labor, materials, and all else necessary for the following: City of Cold Spring 2023 Sanitary Lift Station No. 1 Improvements In general, Work consists of sanitary sewer, forcemain and lift station construction. The project consists of the following approximate quantities: 1 LS Demolition of Existing Lift Station including Control Building and Wet Well Modifications 1 LS Precast Concrete Sanitary Sewer Triplex 25 HP Submersible Pump Lift Station with Valve Vault, Air Release Manhole and Electrical Controls 1 LS Standby Generator 34 LF 24" DIP Sanitary Sewer 40 LF 10" Sanitary Forcemain 2 EA 10" Plug Valve and Box 1 EA 10" Line Stopping Valve 200 TN Bituminous Course Mixtures 428 SY 6" Concrete Walk Along with miscellaneous electrical components and installation, lift station components and installation, sewer main components, potholing, removals, erosion control, restoration, and related appurtenances. Bid Security in the amount of 5 percent of the amount of the Bid must accompany each Bid in accordance with the Instructions to Bidders. The Owner reserves the right to retain the deposits of the 3 lowest Bidders for a period not to exceed 60 days after the date and time set for the Opening of Bids. No Bids may be withdrawn for a period of 60 days after the date and time set for the Opening of Bids. The Owner reserves the right to reject any and all Bids, to waive irregularities and informalities therein, and further reserves the right to award the Contract to the best interests of the Owner. The successful bidder must be a responsible contractor. The term responsible contractor means a contractor as defined in Minnesota Statutes, section 16C.285, subdivision 3. Any prime contractor, subcontractor, or motor carrier that does not meet the minimum criteria or fails to comply with the verification requirements is not a responsible contractor and is not eligible to be awarded a construction contract for the project or to perform work on the project. A prime contractor, subcontractor, or motor carrier that makes a false statement under oath verifying compliance with the minimum criteria will be ineligible to be awarded a construction contract on the project, and the submission of a false statement may result in termination of a contract awarded to a prime contractor, subcontractor, or motor carrier that submits the false statement. A prime contractor shall include in its verification of compliance a list of all of its first-tier subcontractors that it intends to retain for work on the project. Before execution of a construction contract, a prime contractor shall submit a supplemental verification under oath confirming that all subcontractors and motor carriers that the prime contractor intends to use to perform project work have verified to the prime contractor, through a signed statement under oath by an owner or officer, that they meet the minimum criteria for a responsible contractor. Direct inquiries to Engineer's Project Manager, Tim Grinstead at (651) 775-5635 and tim.grinstead@stantec.com.

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.