Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 27, 2023

November 1, 2023

March 31, 2024

Multiple Locations

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - Federal

img_map_placeholder

Multiple Locations, Harbor Springs, MI

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The Little Traverse Bay Bands of Odawa Indians, a federally Recognized Indian Tribe, invites your business to submit a Bid for Snow Removal Services for the 2023-2024 snow season for Wah Wahs Noo Da Ke Village Housing subdivision entrance and roads. Included with this letter are: 1.) A listing of the locations requiring snow removal services. 2.) Provisions governing this ITB. a. Bid Entrance and Roads 3.) Pre-proposal site specific questions can be directed to Amada Swiss by email aswiss@ltbbodawa-nsn.gov. 4.) Map of Area Any questions regarding the bid process may be directed to Mandy Szocinski, at 231-242-1439. SCOPE A. Obtain the necessary equipment, supplies, and materials to accomplish the task of snow removal services at the entrance and corresponding roads of subdivision as indicated in black on map (see Attachment 1). Equipment must be in working order to accomplish the contract obligations 1. Shall plow entrance from Heynig Road into Wah Wahs Noo Da Ke Village, Wah be Noong Circle, Zhow Noong Circle, and Ap-Gish Mok Blvd. Plow snow accumulations of one (1) inch or more. Plowing shall be done once per day, unless a significant amount of snowfall occurs. If such action occurs, the Contractor will only plow after the significant snowfall stops. 2. Routinely salt and/or sand, even when no snowfall, the road ways, intersections and entrance. 3. Must maintain salt and/or sand, on regular basis even when no accumulation has occurred 4. Properly place the snow or remove it to minimize banks and loss sightlines. B. Contractor shall be available for plowing from November 1, 2023 through March 31, 2024. C. Please provide Lump sum contract with per swipe pricing for any time after March 31st. D. Provide Spring clean up of resulting debris left behind by plowing (i.e. excess salt, sand, rocks on the grass, turf repair) E. Observe all applicable prescribed safety regulations and practices (see Appendix A). F. Contractor shall be responsible to make turf, parking lot, sidewalk, roads and curb repairs in areas where Contractors equipment damages said areas.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects