Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 11, 2025

November 27, 2023

December 11, 2023

Adams St

Paving, Site Work

No Information to Display

$600,000.00

Public - City

img_map_placeholder

Adams St, Yucaipa, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Reference Number 0000332691 Traffic Calming Installation of Asphalt Speed Bumps and Striping on Adams Street Scope of Work The contract work for this project shall consist of various items which include but are not limited to preparation of the traffic control, existing pavement, grinding of existing temporary asphalt concrete speed bumps, the installation of asphaltic concrete speed humps and the installation of thermoplastic pavement marking of the speed bumps per the locations and processes called out on the attached Appendix "A and B". Bonding Requirements - Bid Bond 10 % Bonds Each Bid must be accompanied by a cash deposit, cashier's check, certified check or Bidder's Bond issued by a Surety insurer, made payable to the City and in an amount not less than ten percent (10%) of the total Bid submitted. Upon Contract award, the Contractor shall provide faithful performance and payment Bonds, each in a sum equal to the Contract Price. All Bonds must be issued by a California admitted Surety insurer using the forms set forth in the Contract Documents, or in any other form approved by the City Attorney. Failure to enter into the Contract with the City, including the submission of all required Bonds and insurance coverages, within fifteen (15) Days after the date of the mailing of written notice of contract award to the Bidder, shall subject the Bid security to forfeiture to the extent provided by law. Contact Information Katrina Kunkel 909-797-2489 ext. 255 Kkunkel@yucaipa.org Question Acceptance Deadline 10/23/2023 03:00 PM EDT Questions are submitted online Yes Liquidated Damages There will be a Five Hundred Dollar ($500.00) assessment for each calendar day that work remains incomplete beyond the time stated in the Proposal Form. Refer to the Proposal Form for specific details. The City of Yucaipa reserves the right to reject any or all bids, to award each item separately, and/or waive any informality on any bid. No bid may be withdrawn for sixty (60) days after the time set for the opening thereof. The contract work for this project shall consist of various items which include but are not limited to preparation of the traffic control, existing pavement, grinding of existing temporary asphalt concrete speed bumps, the installation of asphaltic concrete speed humps and the installation of thermoplastic pavement marking of the speed bumps per the locations and processes called out on the attached Appendix "A and B".

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects