Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 14, 2023

January 15, 2024

January 13, 2025

7007 Jennings Rd

Site Work

No Information to Display

$2,500,000.00

Public - City

img_map_placeholder

7007 Jennings Rd, Modesto, CA

Subscribe to View Full Documents

Scope of Services At the Jennings Campus, this project will be replacing aging lined Ductile Iron Pipe and Coated Steel pipe due to susceptibility to corrosion from high H2S levels. Additionally, Phase 2 UV Channels are being reinforced with Stainless Steel liners and protective coatings to combat corrosion and algae growth. At the Sutter Campus, a critical issue with influent Flume #2 has been identified, impacting flow measurement accuracy. To address this, the problematic flume is. The Payment of Prevailing Wages is Required on this Project. Project Duration 260 Working Days. License Requirements A California State Contractor License. Project Type Bid, Response Types Line Items, Type of Award Lump Sum. Email all questions to RWRF_Jennings_Campus_Corrosion_Control_Measures_Bid_Questions@docs.e-builder.net by 4:00 p.m., no later than 7 business days prior to the bid opening. The City reserves the right to reject any or all bids or to waive any informalities or minor irregularities in a bid. All bids shall be submitted in a sealed envelope and shall be accompanied by cash, cashiers check, certified check, or bidder's bond made payable to the City of Modesto, for an amount equal to at least 10 percent of the amount of said bid, and no bid shall be considered unless such cash, cashier s check, certified check or bidder's bond is enclosed therewith. Payment Bond 100.00% Performance Bond 100.00%.

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects