Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 8, 2023

January 8, 2024

August 16, 2024

3301 Upton Ave

Renovation

No Information to Display

$1,870,000.00

Public - City

img_map_placeholder

3301 Upton Ave, Toledo, OH

Subscribe to View Full Documents

The Project consists of all labor, materials, equipment, and services necessary for the proper completion of the DeVilbiss Phase IV (referred to as the "Project"), all in accordance with the Drawings and Specifications prepared by the Design Professional. The work for which bids are solicited for the Project must be substantially completed by August 2, 2024, and finally complete by August 16, 2024, unless the Owner selects the alternate for an earlier completion date as provided on the Bid Form. Estimated Construction Cost $1,870,000 A certified check, cashier's check, or irrevocable letter of credit in an amount equal to 10% of the bid. Liquidated Damages. If the successful Bidder does not have its Work Substantially Complete by its Date for Substantial Completion, the successful Bidder shall pay the Owner and the Owner may set off from amounts otherwise due the successful Bidder Liquidated Damages. The daily amounts of Liquidated Damages are set forth in the table included in the Owner/Contractor Agreement. The total amounts of Liquidated Damages will be calculated based on the total number of calendar days beyond the Date for Substantial Completion that the Bidder's Work is not Substantially Complete. A successful Bidder who is awarded a Contract shall be required to attend a pre-job meeting and enter a Project Labor Agreement with the Northwest Ohio Building and Construction Trades Council, within fifteen (15) working days of notification of the award. The Owner reserves the right to reject any, part of any, or all bids and to waive any informalities and irregularities. The Bidder expressly acknowledges this right of the Owner to reject any or all bids, or to reject any incomplete or irregular bid. The Owner will award a single contract for each of the bid packages listed above or one or more combined contracts for combinations of the Bid Packages. Bidders must fumish all information requested on or accompanying the Bid Form. Failure to do so may result in disqualification of the bid. Contractors shall submit written questions to the Design Professional in sufficient time in advance of the bid opening to allow sufficient time for the Design Professional to respond. All Addenda will be issued except as hereafter provided, and mailed or otherwise furnished to persons who have obtained Contract Documents for the Project, at least seventy-two (72) hours prior to the published time for the opening of bids, excluding Saturdays, Sundays, and legal holidays. If any Addendum is issued within such seventy-two (72) hour period, then the time for opening of bids shall be extended one (1) week with no further advertising of bids required. Addenda, as described in the preceding paragraphs, issued in writing or by email to Bidders of record may be issued within the 72-hour period before the bid opening. .

11 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.