Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 9, 2023

May 1, 2024

August 31, 2024

2141 Chem. Saint-Louis

Renovation, Site Work

No Information to Display

$400,000.00

Public - State/Provincial

img_map_placeholder

2141 Chem. Saint-Louis, Quebec, QC

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Reference number: 1770992 Deadline for receiving complaints: 2023-11-06 As part of its asset maintenance master plan, the Commission of the National Capital of Quebec, hereinafter, THE PUBLIC ORGANIZATION, wishes to launch a call for tenders relating to the waterproofing work on the foundations of the janitor's house at the Cataraqui estate. The work to be carried out consists, without limitation, of: 1. Carrying out excavation work, to allow the completion of stone masonry repointing work and the waterproofing of stone and concrete foundations; 2. The evacuation of surplus excavations from the site; 3. Carry out the supply and installation work of a new agricultural drain to be connected to a new dry well (see plans); 4. Carry out backfilling work following foundation waterproofing work; 5. Carry out turfing and stone dusting work in the areas affected by the work; 6. Carry out work to protect existing trees, the interpretation panel and the masonry pilasters of the wooden gallery during the work; 7. Carry out demolition work on a wooden gallery; 8. Carry out the removal and reinstallation work of a wooden stoop. For reinstallation, provide for the supply and installation of screw piles and an angle iron screwed to the foundation wall; 9. Remove and reinstall gutter downspouts and window copings; 10. Carry out temporary protection and heating work to allow work to proceed.

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects