Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 14, 2023

January 3, 2024

May 15, 2024

4975 US-51

Outdoor Lighting, Site Work

No Information to Display

$150,000.00

Public - State/Provincial

img_map_placeholder

4975 US-51, Senatobia, MS

Subscribe to View Full Documents

A. This section specifies the basic electrical requirements for this project as well as the general requirements which apply to the work of Division 26 in addition to those stipulated in Division 01. Should any discrepancies exist between the requirements of Division 26 and those found in Division 01; the more stringent requirement shall govern except where the two requirements are contradictory in which case the Division 01 requirements shall govern. B. The electrical work required for this project consists of furnishing all labor, equipment and materials necessary to obtain complete and operational electrical systems as indicated on the drawings and as specified herein. C. The Contractor shall furnish all material and labor as required for the installation of the new electric service per the local power company's requirements. The Contractor shall coordinate with the local power company for all requirements. A. Remove portion of concrete walks, concrete gutter, and concrete building footing and slab as required to accomplish new work. B. Fill excavations, open pits, and holes in ground areas generated as result of removals, using clean fill dirt; compact fill. NWCC Soccer Field Lighting Project Questions regarding website registration and online orders please contact PH Bidding at (662) 407-0193. The contract will be awarded to the lowest and/or best bid from a responsive responsible and qualified Bidder. Should no award be made within sixty (60) calendar days after opening of proposals, all proposals may be rejected and all proposal guaranties returned, unless the lowest responsive responsible qualified bidder, at the request of the Owner, agrees in writing to a longer delay. Northwest Mississippi Community College reserves the right to waive any irregularities and to reject any and all bids if considered not in the best interest of Northwest Mississippi Community College.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects