Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 1, 2023

January 8, 2024

November 28, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$400,000.00

Public - County

img_map_placeholder

Multiple Locations, Las Cruces, NM

Subscribe to View Full Documents

DRAGONFLY CHANNEL PHASE 2A & 2B This project will be funded utilizing both state capital outlay funds and federal American Rescue Plan funds. Bidders should be made aware that the utilization of funds on this project will reference 2 C.F.R. 200.319(c). This section prohibits state, local, or tribal geographical preferences in the evaluation of bids or proposals. Bidder's attention is also directed to the fact that utilizing federal funding requires that Buy America provisions apply to the iron, steel, manufactured products and construction materials used to construct these phases. For details, see Guidance on Buy America memo within the project manual. Bidder's attention is directed to the fact that "Subcontractors Fair Practices Act" will be in effect for this project. Phase 2A consists of channel construction, energy dissipation & access features, maintenance road construction, installation of fencing and lowering of existing agricultural waterlines. Channel construction will include 244,000 CY of earthwork to be excavated and stored within the designated deposition area1, with top soil stripped and stockpiled to cap deposition area1 at the end of earthwork activity, approximately 15,000 CY of excavation off site to waste2, and 34,600 CY of excavation to embankment to construct channel. Energy dissipation & access features will include 5,342 CY of soil cement and 1200 CY of wire enclosed rip rap to construct (4) 5' tall soil cement drop structure consisting of 1' stair stepped lifts, and soil cement maintenance ramps on each side of the channel for every section in between drops. Additional energy dissipation will be constructed with a rip rap erosion dissipation pad at the entrance to Isaacks Lake. Maintenance road construction will consist of 15,500 SY of 4" base course in 12' width along both sides of the channel. Installation of fencing will include installation of 9,450 LF of new 4 strand wire fencing along both sides of the channel. 720 LF of existing 1 1/4 " black poly agricultural water lines will need to be lowered underneath channel bottom and encased within a 4" HDPE Gas line sleeve and connected to existing lines on either end of the channel. Phase 2B consists of channel construction, energy dissipation & access features, maintenance road construction, installation & removal of fencing and utility lowering. Channel construction will included 234,000 CY of earthwork to be excavated and stored within the designated deposition area1 , with top soil stripped and stockpiled to cap deposition area1 at the end of earthwork activity, approximately 15,000 CY of excavation off site to waste2 , and 40,000 CY of excavation to embankment to construct channel. Energy dissipation & access features will include 6,150 CY of soil cement and 440 CY of wire enclosed rip rap to construct (5) 6' tall soil cement drop structure consisting of 1' stair stepped lifts, and soil cement maintenance ramps on each side of the channel for every section in between drops. Maintenance road construction will consist of 15,500 SY of 4" base course in 12' width along both sides of the channel. Installation of fencing will include removal of 2,315 LF of existing fence and installation of 11,500 LF of new 4 strand wire fencing along both sides of the channel. 520 LF of existing 12" PVC water lines will need to be lowered underneath channel bottom and replaced with 12" ductile iron water line and installed with appropriate fittings.

22 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects