Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 18, 2023

December 18, 2023

April 16, 2024

County Road 890 and County Road E890

Renovation

No Information to Display

$250,000.00

Public - County

img_map_placeholder

County Road 890 and County Road E890, Stilwell, OK

Subscribe to View Full Documents

Bell Standpipe Rehabilitation Site Directions: Half Mile East of Intersection of CRE890/S4729 on E890 Adair County (Stilwell, OK.) Paint interior and exterior of standpipe and perform miscellaneous rehabilitation. Project is located in Adair County. Tank location is approximately one half mile east of the intersection of County Road 890 and County Road E890 on E890 (Stilwell, OK.) Each sealed envelope containing a BID must be plainly marked on the outside as Bell Standpipe Rehabilitation and the envelope should bear on the outside the BIDDER'S name, address, and license number, if applicable, and the name of the project for which the BID is submitted. The work covered in these CONTRACT DOCUMENTS generally consists of: 1. Removal of existing exterior surface coatings, surface repair, preparation, and painting. 2. Installation of exterior graphics and/or lettering. 3. Removal of interior (wet) surface coatings, surface repair, preparation, and painting. 4. Containment and disposal of all removed coatings and spent blast media. 5. Remove existing and replace new chain link fence. 6. Install new 30" manway. 7. Repair/replace interior ladder. 8. Install new interior Saf-T climb. 9. Extend inlet piping and install passive mixing system. 10. Misc. Items to include: a. Remove cabling from ladder handrail. b. Replace overflow mesh screen. c. Tighten existing exterior ladder saf-t climb. d. Caulk around base of tank. 11. Inspection testing and documentation of work. 12. Cleaning and disinfection prior to returning tank to public service.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.