Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

September 2, 2024

No Information to Display

5951 Monaco St

Site Work

No Information to Display

$2,800,000.00

Public - City

img_map_placeholder

5951 Monaco St, Commerce City, CO

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Estimated Cost/Amount: $2,900,000 There are four major fixes needed for Paradice Island estimated at a total $2,800,000 in repairs plus an additional $100,000 project contingency. - Spray Ground Renovation, Leaking underground pool pipes (Attached image, red lines show damaged lines/leaks), Tile work replacement, Re-plastering of pools Spray Ground Overview: ($1,600,000) The project will involve demolition of existing spray ground, design, construction, and installation of a new spray ground that meets all safety and regulatory requirements. The spray ground will be designed to provide a fun, interactive, and safe environment for children and families to enjoy. Leak Repair Overview: ($335,000) - Remove sections of the deck, excavate, demo sections of the pool surface, core drill pool shell, run penetration pipes, install plumbing and test installation. Next, backfill trenches, pour deck concrete, final preparation of surface for plastering pool. Tile Work Overview: ($415,000) - During the time of the leak repair, the contractor would simultaneously perform tile work needed throughout the pool area, at the identified locations. Re-plastering Overview: ($450,000) - Final step, once leak repair and tile work has been completed. Contractor would plaster the pool surfaces then fill pools to cure plaster. Contingency Request: ($100,000) As of October 16, 2023, this project is included in the City of Commerce City's - FY 2024-2028 CIP and funding allotted for FY 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.