Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 26, 2023

November 27, 2023

February 25, 2024

225 11th St

Renovation

No Information to Display

$50,000.00

Public - County

img_map_placeholder

225 11th St, Toledo, OH

Subscribe to View Full Documents

Shower repairs at the Youth Treatment Center located at 225 11th Street, Toledo, Ohio 43604. 12 total shower rooms will be repaired conducted in 4 phases so that three restrooms are operational at all times. A signed Bond with seal for the full amount of the Bid, meeting the requirements of section 153.54 to 153.57, Ohio Revised code, OR a certified check payable to the Lucas County Treasurer for ten percent (10%) of the full amount of the bid, must be included with each bid or the bid will be disqualified. Bonds will be returned to unsuccessful bidders within thirty (30) days of contract award. Questions regarding the specifications outlined in this ITB should be directed in writing to: Joe Snyder Email: Joe@buehrergroup.com Unless otherwise specified in the Contract Documents, the Lead Contractor shall furnish and erect a Project identification sign within 30 days of the date of the Notice to Proceed, which sign shall be in accordance with a sketch provided by the Architect. 20.5.2 The sign shall be maintained in good condition until the completion of the Project at which time it shall be removed by the entity providing same. 20.5.3 Any cost associated with moving or repairing the Project identification sign during the progress of the Project shall be the responsibility of the entity providing same

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.