Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 3, 2023

January 2, 2024

June 26, 2025

Multiple Locations

Site Work

No Information to Display

$2,500,000.00

Public - County

img_map_placeholder

Multiple Locations, Tom Bean, TX

Subscribe to View Full Documents

Post Oak Road and Ladd Road, Sherman, Texas, 75090 Proposals are requested to include the following: Mobilization (Include all management plans, facilities, P6 Schedule (with labor and equipment resources loaded) Clear/Grub/Strip Topsoil Establishment of any required BMPs for Stormwater management specific to this . Early Mass Grading Design Structure Excavation/Over-Excavation, including any potential rock excavation. Submit design with proposal indicating volumes of anticipated excavation, specifying how much rock volume bid was anticipated based on Draft Geotechnical Report. Provide an Optional Price to install rock anchors, if required. Process Moisture Conditioned Fill, Haul to Backfill, and Embank Recompacted Fill to Establish Subgrade. Provide an option to protect subgrade by placing a 4" to 6" thick concrete slab (Mud Mat) 4' beyond structure in all dimensions. Provide recommendation on thickness and supporting design, along with dimensions, by structure. Hauling of All Spoils to designated Stockpiles, provide Stockpile Maintenance and Dust Control Design, Install, and Inspect and Support of Excavation required. Submit design with proposal. Design and Install Water Management scheme and/or Dewatering in all excavations, including any necessary permitting, treatment, and monitoring. Drainage Management, including establishment of Berms around Excavations and rocked trenches to divert water. Submit design or relevant details with proposal. Design and Install Access (Ramps/Stairs/Crane Pads). Submit designs with proposal. De-Mobilization A technically acceptable Bid with the Best Value offered that best meets the OWNER required need shall be the basis for evaluation of the Bids. Best Value will be scored with pricing (30%), ability to meet project schedule (40%), and Commercial/Technical (30%). Deadline 10/25/2023

37 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.