Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 7, 2023

December 7, 2023

December 6, 2024

Shelby Farms Greenline

Paving, Site Work

No Information to Display

$600,000.00

Public - County

img_map_placeholder

Shelby Farms Greenline, Memphis, TN

Subscribe to View Full Documents

This project involves the construction of a ten foot wide paved asphalt bicycle/hiking path with graded base and crushed limestone surface. The project extends the Shelby Farms Greenline from the Old Cordova Train Station to Lenow Road. The deadline for submitting questions will be Thursday, October 26, 2023 at 5:00 p.m. (CST) This project involves the construction of a ten foot wide paved asphalt bicycle/hiking path with graded base and crushed limestone surface. The project extends the Shelby Farms Greenline from the Old Cordova Train Station to Lenow Road. This work consists of the conditions that apply to all construction activities on the project pursuant to the following: 1. Section 404 of the Federal Clean Water Act (33 U.S.C. 1344), and all implementing regulations, including without limitation regulations of the U.S. Army Corps of Engineers governing permits for discharges of dredged or fill material into waters of the United States in 33 CFR Part 323; and 2. The Tennessee Water Quality Control Act (T.C.A. 69-3-101, et seq.) and all implementing regulations, including without limitation the Rules of the Tennessee Department of Environment and Conservation governing NPDES permits in Chapter 400- 40-10, and Aquatic Resource Alteration permits in Chapter 400-40-7; and 3. Section 26a of the TVA Act of 1933 as amended (49 Stat. 1079, 16 U. S. C. sec. 831y1.) and all implementing regulations, including without limitation the regulations of the Tennessee Valley Authority governing construction in the Tennessee River System in 18 C.F.R., Part 1304; and 4. The Tennessee Wildlife Resources Agency Reelfoot Lake Watershed Management permit program (T.C.A. section 70-5-1,), and all implementing regulations, including without limitation regulations authorizing any activity, practice, or project which has or is likely to have the effect of diverting surface or subsurface water from the Lake or have the effect of draining or otherwise removing water from Reelfoot Lake; and 5. Coast Guard Bridge Permit (USCG) (Section 9 of the Rivers and Harbors Appropriation Act of 1899) and all implementing regulations, including but not without limitation for projects which impact streams deemed navigable by the U.S. Coast Guard.

13 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.