Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 2, 2023

December 4, 2023

November 22, 2024

402 Main St

Renovation

No Information to Display

$200,000.00

Public - City

img_map_placeholder

402 Main St, Corinth, ME

Subscribe to View Full Documents

The project scope consists of removal of existing ductwork, relief hoods, unit ventilators, and controls. Installation of new HVAC systems shall consist of the installation of Energy Recovery Ventilation systems, ductwork, cabinet unit heaters, unit ventilators, DDC controls, etc. Scope shall include structural, architectural, and electrical work required for new systems. A bid security will be required consisting of a 5 percent (5%) Bid Bond or a Certified Check in lieu of the Bid Bond is required. Performance Bond and Payment Bond, each for 100% of the value of the work are required. The Davis-Bacon Act requirements apply to this project.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.