Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

November 4, 2024

October 30, 2025

44 Pierrepont Ave

Renovation

No Information to Display

$39,954,000.00

Public - State/Provincial

img_map_placeholder

44 Pierrepont Ave, Potsdam, NY

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

The State University Construction Fund (SUCF) is seeking Statements of Qualifications (SOQs) from consultants to provide design and construction administration services for the Renovate Barrington Student Union project at the State University College at Potsdam The Project will provide a comprehensive renovation of the building including the replacement of all interior finishes, mechanical ductwork, electrical and plumbing systems and kitchen equipment. The Project will include the removal of hazardous materials and will meet current code and ADA requirements. An embedded program study for the building will be undertaken as part of the project, including and evaluation of the existing dining services across multiple buildings and where best to locate them in the future. Barrington Student Union provides meeting space for student associations and clubs general student activity space and includes dining services for students and faculty. Barrington Student Union, constructed in 1970, is an 76,340 GSF, two-story building. The interior spaces of the building are original, are at the end of their useful life, and need modernization to help attract and retain students, as well as improve the overall student experience. Replacement of the mechanical room equipment was completed in 2021 under SUCF project 121009. As such, the ductwork is only remaining HVAC component original to the building. The construction value is estimated at approximately $39,954,000. Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 15% Women Owned Sub-Contracting Goal: 15% Service-Disabled Veteran-Owned Business Contracting Goal: 6% The method of Contractor Selection has not been Determined at this time. Contract term: 10/30/2025

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.