Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

November 1, 2024

No Information to Display

Rural Hill St

Demolition, New Construction, Paving, Site Work

No Information to Display

$400,000.00

Public - City

img_map_placeholder

Rural Hill St, Northville, MI

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Reference Number 0000332810 The City of Northville is seeking engineering design services for Rural Hill Drive Bridge Superstructure Replacement. The City objective is to replace the deteriorated bridge. Rural Hill Bridge is the only entrance into the only active Rural Hill Cemetery in the City of Northville. The bridge encounters daily vehicle and foot traffic throughout the year. Since 2016, the City identified that the bridge on Rural Hill Drive needs to be significantly rehabilitated or replaced. In 2022 a resolution by City Council and application was submitted to MDOT for 2025 funding. The City has secured funding through the MDOT Local Bridge Program. This project involves the replacement of the superstructure on the single span precast concrete double t-beam bridge structure carrying Rural Hill Drive over Johnson Drain in the City of Northville. It is anticipated that the proposed superstructure will consist of a prefabricated timber structure. This structure will reduce construction time and will blend in with the surrounding area aesthetically. The cross section of the bridge is proposed to accommodate two 10-foot lanes and 2-foot shoulders for a total clear roadway width of 24-feet. Question Acceptance Deadline 10/19/2023 01:00 PM EDT Questions are submitted online No Questions regarding this RFP shall be submitted via e-mail and should be addressed to, Mike Domine, Director of Public Works, at and mdomine@ci.northville.mi.us . Responses to questions will be posted as an addendum and incorporated into the terms and specifications of this RFP.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.