Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
November 14, 2023
December 2, 2024
May 31, 2028
1 University Dr
Demolition, LEED Certification, New Construction, Renovation, Site Work
No Information to Display
$66,400,000.00
Public - State/Provincial
1 University Dr, Cullowhee, NC
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
This project will consist of demolition, repair, renovation, replacement, upgrades, and new construction to support and address needs and requirements for athletic facilities with a total project budget of $66,400,000. Project to provide for needed repair, renovation, and replacement to support and address athletic facilities deferred maintenance and programmatic requirements. Project to include, but not be limited to, the following: o Whitmire Stadium Improvements: A new facility hosting an Academic Suite, a Chancellor's Suite, and a Press Box would be constructed above the existing restroom and concessions facilities at the back of the existing west stand bleachers. An improved pedestrian walk that brings fans from the parking garage along the west side of the stadium to an improved entry plaza between the proposed Football Operations facility and the existing west stands will also be created. Due to a failing expansion joint and evidence of concrete cracking throughout, the upper section of the east stands is planned for demolition. Following demolition, an upper level plaza will be created with restroom facilities and opportunities for on-site concession setup, while also being designed for potential future bleacher seating. o Football Operations Facility: Located along the north, this facility will include a football locker room, player's lounge, equipment area, team meeting spaces, and coaches' offices. The new facility will also provide space for an WCU Athletics Hall of Fame, sports medicine, strength and conditioning, and academic facilities for all student-athletes. To minimize the disturbance to athletics seasonal schedule, it was decided that the Football Operations facility would be built in two phases, allowing the existing Jordan-Phillips Field House to remain operational while the first phase is constructed west of its footprint. This initial phase, Phase I, would include the WCU Athletics Hall of Fame and the strength and conditioning space. Upon completion of Phase I, Jordan-Phillips Field House will be demolished, and Phase II will be constructed. Phase II will house the sports medicine facility, the football locker room, player's lounge, and equipment area on the lower level. The second level would house the team meeting spaces and coaches' offices. A roof top assembly space would replace the existing "Paw's Porch" gameday viewing and occupy the third level. o Field Sports Complex: Soccer, Track & Field, and Golf are presently housed in the existing 1965 Camp Lab K-12 Gym. This facility, residing in the floodplain, is beyond its useful life and contains multiple deferred maintenance and non-code compliant items. To meet the current needs of Soccer, Track & Field, and Golf programs, a new facility is proposed north of the existing practice soccer field while also allowing for the demolition of the existing Camp Lab Gym. The proximity to the Catamount Athletic Center and the planned Golf Short Game facility makes this location an ideal multi-sport building location. This new building will house men's and women's Track and Field Locker Rooms, a Soccer Locker Room, a Golf Indoor Practice Facility, a satellite Training room, as well as a shared player lounge. Golf's indoor facility would be conveniently located adjacent to the planned short game facility, covered hitting bays for the short game facility would serve as a porch for the new building. Inside the golf team would have space for two golf simulators, a large undulating practice green, lockers and equipment storage, as well as two changing/restrooms. All questions and project submittals are to be directed to: Curtis Monteith, Director of Capital Projects Western Carolina University Facilities Management 3476 Old Cullowhee Road Cullowhee, NC 28723 (828) 227-7441 cmonteith@wcu.edu
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Cullowhee, NC
Bid Date: Nov 15 2023
Cullowhee, NC
Bid Date: Oct 25 2024
Cullowhee, NC
Bid Date: Oct 25 2024
Cullowhee, NC
Bid Date: Sep 12 2023
Waynesville, NC
Bid Date: May 05 2021
Halifax, NC
Bid Date: Nov 09 2023
Winston Salem, NC
Bid Date: Jul 10 2025
Blowing Rock, NC
Bid Date: Nov 09 2023
Shelby, NC
Bid Date: Oct 17 2023
Elkin, NC
Bid Date: Oct 17 2023
Leland, NC
Bid Date: Oct 26 2023
Holden Beach, NC
Bid Date: Nov 28 2023
Huntersville, NC
Bid Date: Oct 17 2023
Louisburg, NC
Bid Date: Oct 17 2023
Pittsboro, NC
Bid Date: Oct 17 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
