Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 14, 2023

December 14, 2023

January 9, 2025

Multiple Locations

Paving, Site Work

No Information to Display

$900,000.00

Public - City

img_map_placeholder

Multiple Locations, Saint Louis, MO

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Replacement of curbs, sidewalk, and other incidental construction in the public right of way related to the City's 50/50 Sidewalk Program. The Minority Business Enterprise (MBE) and the Women-Owned Business Enterprise (WBE) (together the M/WBE) participation goal for this Letting is 24% MBE participation distributed as follows: 21% African American, 2% Hispanic American, 0.5% Asian American, and 0.5% Native American plus 11% WBE participation. M/WBE participation level is based on the base bid and any alternates accepted. On contracts with an estimated cost of $300,000 or less, a 5% bid discount will be applied to M/WBE Bidders during the evaluation process; the actual contract amount shall not be lowered. Each bid must be accompanied by a Cashier's or Treasurer's Check of a Bank or Trust Company in the City of Saint Louis, payable to the Order of the City Treasurer, or a Surety Bond approved by the Comptroller, for the amount of Deposit required, as heretofore stated. If submitting a paper Bid Bond or Check, an original copy must be submitted to the Board of Public Service (Helen Bryant, Room 301 City Hall, 1200 Market Street, St. Louis, MO 63103) prior to bid opening, and a scanned copy must also be uploaded with the bid. Contractors and sub-contractors who sign a contract to work on public works project must provide a 10 - Hour Occupational and Safety and Health Administration (OSHA) construction safety program or similar program approved by the Department of Labor and Industrial Relations to be completed by their on-site employees within 60 days of beginning work on the construction project. Schedule Related Liquidated Damages: $275.00/per day 280 Working Days Bid Deposit $22,725.00 Estimated Cost $900,000.00 The right of the Board of Public Service to reject any or all bids is expressly reserved.

10 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects