Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 16, 2023

December 18, 2023

June 30, 2024

Multiple Locations

Site Work

No Information to Display

$400,000.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Tekamah, NE

Subscribe to View Full Documents

Dam Site 33 consists of excavating left and right banks of the plunge pool, placement of drainage piping, reestablishing bank slopes, and constructing an aggregate filter diaphragm Dam Site 30 will consist of construction of a seepage diaphragm, replacement of HDPE piping, excavation and removal of the existing principal spillway, and placement of a new pipe for the principal spillway. Project questions may be directed to Dan Lightbody with Olsson at (402) 458-5003; or Justin Novak (PapioMissouri River NRD) at (402) 616-0969.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.