Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 2, 2023

December 4, 2023

April 2, 2024

Halfway Rd

Site Work

No Information to Display

$150,000.00

Public - City

img_map_placeholder

Halfway Rd, Marion, IL

Subscribe to View Full Documents

Construction of the Halfway Rd Storm Drain Improvements Attention is Called to the Fact That Not Less Than the Minimum Salaries and Wages as Set Forth in the Contract Documents Must Be Paid on This Project. The proposed improvement consists of constructing approximately 18-LF of 24-inch RCP, 697- LF of 42-inch RCP, 216-LF of 48-inch RCP, two inlets, and three manholes within the City of Marion. Two existing inlets and one existing manhole is to be removed along with 180-LF of existing storm drain. A total of approximately 166-SY of concrete and asphalt pavement is to be removed and patched (93-SY). Watermain (8") will be relocated in two locations to provide 18- inches of minimal cover above or beneath the proposed storm drain.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.