Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

November 7, 2024

March 2, 2026

To Be Determined

Renovation

No Information to Display

$10,000,000.00

Public - Federal

img_map_placeholder

To Be Determined, Killeen, TX

Our team is requesting plans for this project.

Subscribe to View Full Documents

The U.S. Army Corps of Engineers - Fort Worth District has been tasked to solicit for and a --Build Construction contract Bldg. 410 Renovations (Phase 1) on Fort Cavazos. The proposed project will be a competitive, firm-fixed price procurement. The acquisition strategy decision will be based on the respondent's capabilities from this and/or other market research methods. See Attachment for sources details. This project is Phase 1 of the renovation of Building 410 to improve the heating and cooling, add improved fire protection and address life safety issues. Building 410 is the First Army Division West Headquarters and provides administrative facilities for unit personnel functions. The 124,817 square foot three level building consists of offices, conference rooms, classrooms, weapon vaults, fitness area, showers and supporting function mechanical, electrical, and communication rooms. Building 410 is made up of four independent building quadrants with a central courtyard. Upgrade of the building HVAC system to include replacement of building chillers and boilers and replacement of external cooling tower. Upgrade 3rd floor HVAC to include upgrade of HVAC systems, routing of new ductwork, hydronic piping in overheads, and expansion of specific mechanical rooms. Install new fire suppression system capable of supporting the whole building including a new fire riser system, sprinklers will only be installed on the third floor. Other work to include incidental work on the third floor only such as new acoustic ceilings and lighting plan, upgrade of specific doors and door hardware to STC 50 rating. The third floor will not be occupied during construction, but the remainder of the building will be occupied and systems must remain operational. The of construction for this project is estimated between $5,000,000 and $10,000,000. Estimated duration of the project is 480 calendar . The Method of Contractor Selection has not been determined at this Time *The for this project is based on a financial range. The is listed as the highest possible cost from the range provided by a stakeholder or official project document.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.