Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
No Information to Display
December 27, 2023
December 31, 2028
Multiple Locations
Service, Maintenance and Supply
No Information to Display
No Information to Display
Public - Federal
Multiple Locations, Overgaard, AZ
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Background: The Beaver-Long Draw Stewardship IRSC shall be awarded under the following authority: Stewardship Authority: Section 604 (16 USC 6591c) of Public Law 108-148 as amended by Section 8205 of Public Law 113-79, the Agricultural Act of 2014--Grants the U.S. Forest Service (Government) permanent authority to enter into stewardship contracts or agreements to achieve land management goals for the National Forests or public lands that meet local and rural community needs. Section 8205 supersedes the temporary authority granted to the Forest Service (Government) in section 347 of Public Law 105-277, the Omnibus Consolidated and Emergency Appropriations Act, 1999. NAICS: 115310: Support Services for Forestry, size standard: 34M Fuels Management Services. Stewardship authorities permit the Government to solicit this requirement as Full and Open competition. Project Location: The Beaver-Long Draw IRSC consists of two project areas on the Black Mesa Ranger District. The Beaver project area is contained within a gross stewardship area of 3,067 acres. The Beaver project area is located northwest of the community of Forest Lakes, bound by the Mogollon Rim, Turkey Creek, and Beaver Canyon. The Beaver Stewardship area includes all or part of section(s) 12, 13, 23, 24, 25, 26, 27, 34 and 35 of T12N, R13E; sections 7, 18 and 19 of T12N, R13E; all based on the Gila and Salt River Prime Meridian. The project area can be reached by traveling west 11 miles from AZ State Route 260 to the junction of Forest Road (FR) 300 and FR 92. Cutting units are accessed via FR 92. Cutting units boundaries are designated with two orange horizontal bands facing towards unit. Vertical stripes at base of tree facing towards next boundary tree indicate boundary direction. The Long Draw project area is contained within a gross stewardship area of 3,677 acres. It is located within Coconino County, Arizona. The Long Draw stewardship area is located west of Chevelon Canyon Lake bound by Forest Road 169 and Alder Canyon. The area includes all or part of section(s) 15, 16, 17, 20, 21, 22, 28, 29, 30, 31, 32, and 33 of T13N, R14E; 6 of T12N, R14E: all based on the Gila and Salt River Prime Meridian. The project area can be reached from Forest Lakes, AZ by heading west on AZ-260 for 6 miles and turning right onto Forest Road 300 (Rim Road). Follow signs for Chevelon Canyon Lake. Travel north 8.4 miles to the junction of FR 300 and FR 169 and turn right. Travel north on FR 169 for 12 miles to reach the stewardship area. Cutting units are accessed from a network of roads via FR 169. Cutting units boundaries are designated with two orange horizontal bands facing towards unit. Vertical stripes at base of tree facing towards next boundary tree indicate boundary direction. Period of Performance: All work shall be completed by December 31, 2028. Description of Work: Commercial harvest of live tree (non-salvage) conifer species including but not limited to: Ponderosa pine, Douglas-fir, Southwestern white pine and white fir or any combination thereof. All harvest operations are ground based on slopes of generally less than 35% with skidding on a variety of terrain. Average skid distances are typically 405 feet. Non-sawtimber removal may include any or all species listed above and may include material greater than 5.0 inches DBH up to the minimum sawtimber diameter specifications. Non-included material is any conifer species and/or size that is not included in Appendix B, Division AT Utilization Standards. Road maintenance of haul routes. Timing restriction for Mexican Spotted Owl is March 1 to August 31 annually. Subsidized removal of surplus forest products to deficit markets will be available as an optional work item. Estimated Timber Volume and Species composition is as follows: The Beaver project area contains an estimated 5,572 CCF of sawtimber and an additional 3,040 CCF of non-saw and biomass products. The Long Draw project area contains an estimated 5,033 CCF of sawtimber products and an additional 7,745 CCF of non-saw and biomass products. Pre-Solicitation Site Visit Date and Time: Prior to solicitation, the Forest will hold a site visit for prospective contractors to facilitate dialogue on contractual requirements that are anticipated in the contract and any operational limitations foreseen by attendees. The site visit will be held on October 24, 2023, at 09:00 a.m. MST with a meeting location at Black Mesa Ranger District office, 2748 E. AZ 260, Overgaard, AZ 85933. Send questions or interest to Curtis Yocum at curtis.yocum@usda.gov or Matt Daigle at matthew.daigle@usda.gov. Follow this notice on SAM for future notifications. It is anticipated that the Request for Quotes with all attachments shall be issued on or around October 27, 2023. The contract shall be awarded using a best value source selection method; the resulting contract shall be a firm fixed price commercial services contract.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Phoenix, AZ
Bid Date: Nov 09 2023
Yuma Proving Ground, AZ
--
Yuma Proving Ground, AZ
--
Yuma Proving Ground, AZ
Bid Date: Jun 11 2025
Glendale, AZ
Bid Date: Nov 17 2023
Mesa, AZ
Bid Date: Feb 08 2023
Flagstaff, AZ
Bid Date: Nov 15 2023
Queen Creek, AZ
Bid Date: Oct 20 2023
Phoenix, AZ
Bid Date: Oct 31 2023
Phoenix, AZ
Bid Date: Sep 21 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
