Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 14, 2023

January 15, 2024

July 1, 2024

Calle Ariana & Avenida De Las Palmera

Paving, Site Work

No Information to Display

$2,000,000.00

Public - City

img_map_placeholder

Calle Ariana & Avenida De Las Palmera, San Clemente, CA

Subscribe to View Full Documents

Question Deadline 11/03/2023 at 2:00 PM PT All questions related to this bid solicitation must be submitted in writing via email to Amir K. Ilkhanipour at ilkhanipoura@san-clemente.org The work to be performed, includes installation of approximately 221 linear feet of 42-inch HDPE pipe; approximately 172 linear feet of 28-inch HDPE pipe; construction of six (6) catch basins (and connectors); construction of 1,100 linear feet of PVC sewer force main with two connections to the existing 6-inch AC force main; construction of a new sewer 48-inch diameter manhole on an existing 8-inch VCP gravity sewer; construction of approximately 50-feet of 8-inch PVC gravity sewer 2 feet under an existing 8-inch VCP gravity sewer and maintaining sewer flows; construction of approximately 240 linear feet of 4-inch conduit with pull rope and pull boxes from an existing SDG&E pull box to a new transformer pad to replace the existing pad adjacent to the existing lift station electrical room; construction of approximately 140 feet of 2-inch Cox communication conduit with pull rope and pull boxes from the existing pull box adjacent to the existing lift station wet well to the existing lift station electrical room; construction of six (6) 2-inch conduits and pull boxes from the existing pull box adjacent to the existing lift station wet well to the existing lift station electrical room with power, grounding and communication wires; the reconstruction of storm drain ocean outlet; and construction of nine (9) 30-inch diameter concrete caissons (50-feet deep each), grading; construction of curb and gutter and asphalt paving improvements, all as described in the attached specifications and plans. The general method of the storm drain, sewer forcemain and gravity sewer construction work includes limited removal and replacement of existing A.C. pavement and Portland cement concrete curb & gutters, sidewalks, erosion control BMPs, construction of new concrete junction structures, construction of catch basins and protection (in place) of existing utilities. The work also includes traffic control. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% License Requirements Class A. Start/Delivery Date 1/2024 Project Duration 120 Working Days

43 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects