Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

May 17, 2024

No Information to Display

Multiple Locations

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

Multiple Locations, Watertown, CT

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

CSO Solicitation No. CSO 2428 Your firm has been prequalified by the Connecticut Department of Transportation (Department) in the categories listed above for the 2023 calendar year. The Department is seeking to engage two (2) consultant engineering firm(s) to provide task-order engineering services to supplement the Department's in-house highway design staff and to provide the needed flexibility to respond rapidly to meet the demands of current and future programs on various projects, both in design and construction. The Department, in its sole discretion, reserves the right to cancel this solicitation and terminate the process to retain consultant services, and is under no obligation to contract for the services specified herein. The Department reserves the right to add other assignments of a similar nature to this selection process should the need arise prior to the interview phase. Please be advised that firms must continue to be prequalified in the specified categories for the year a shortlist is finalized and/or a selection is made. All inquiries regarding this request for letters-of-interest shall be directed to Ms. Amie Maines, of the Consultant Selection Office at (860) 594-3346, or amie.maines(5),ct.gov. The method of contractor selection has not been determined at this time. CT DOT - RFP - Task Order Engineering Services for Highway Design

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.