Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 7, 2023

March 7, 2024

No Information to Display

Multiple Locations

Addition, Demolition, Paving, Renovation, Site Work

No Information to Display

$60,000.00

Public - City

img_map_placeholder

Multiple Locations, Ada, OK

Our team is requesting plans for this project.

Subscribe to View Full Documents

Request for Qualifications for Construction Manager at Risk: site planning, building plans, construction plans and specifications as well as bid documents for construction of a new Multiuse Center and site expansion as part of the Ada Sports Complex and Recreation Area. The City of Ada is seeking Statements of Qualifications from qualified Construction Manager at Risk Companies (CMAR) interested in providing professional services for pre-construction project development activities and construction services. These services would be coordinated with the selected design team to begin expansion of the existing Sports Complex and a new 50K-75K SF Multi-use Facility. The sixty-five acre site plan and facility will include basketball courts, pickleball, soccer, walking trails, multiple flat fields, and playground area. The (CMAR) Construction Manager at Risk services will include delivery of the project within a Guaranteed Maximum Price (GMP) based on the construction documents and specifications. The CMAR will provide professional, pre-construction phase services and act as a consultant to the Owner in the Schematic Design and construction phases. The CMAR is being engaged at the beginning stages of Schematic Design, enabling the designers and builders to collaborate through the remainder of the project to achieve optimum results for the Owner All questions regarding this Request for Qualifications should be submitted via email only prior to 4:00 p.m. on October 31, 2023. Please address questions to Shelly Williams, Engineering Project Manager, at the following email address: Shelly Williams, PE Email: shelly.williams@adaok.com The City of Ada looks forward to reviewing the RFQ submittals and working with the selected team in a successful development of this project.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.