Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 2, 2023

November 27, 2023

May 25, 2024

4505 Middlebrook Pike

Renovation

No Information to Display

$350,000.00

Public - City

img_map_placeholder

4505 Middlebrook Pike, Knoxville, TN

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Description of work: The work consists of the replacement of the HVAC systems in the Field Operations building on the KUB Hoskins Campus. This work includes the demolition of the existing HVAC systems as well as the ceiling to allow for the installation of the new systems. New 4-pipe air handling units with Variable Air Volume (VAV) reheat and new controls will be installed. In conjunction with the HVAC system replacement, new lighting to be installed throughout the renovation area. CONTRACTOR will provide all labor, materials, equipment, and incidentals as required to perform the Work. Contractor shall provide any traffic control devices as may be required. The CONTRACTOR shall supply all other incidental items necessary to complete the Work. This shall include all cost required to complete the work including but not limited to supervision, supplies, labor, hand digging, transportation, and equipment Q & A deadline: Oct 24, 2023 4:00:00 PM EDT All Bids must be made out on the bid form provided with the Bidding Documents. Each bidder must turn in a security deposit with its Bid. The deposit is five percent (5%) of the Bid amount, subject to the conditions stated in the Instructions to Bidders. The successful bidder shall also be required to execute performance and payment Bonds in such amounts as required by the Bidding Documents, furnished by the bidder and which are used by the bidder, (or the bidder's permitted Subcontractors) in performing the Work. No bidder may withdraw his Bid within sixty (60) days after the actual opening date of the Bid The OWNER encourages bids by qualified minority and/or woman owned business enterprises (MBE, WBE) and also encourages the use of qualified minority and/or woman owned businesses as Subcontractors Notice of Award November 9, 2023 Notice to Proceed on or before November 27, 2023 Required Substantial Completion: 180 days following the Commence Date stated in Notice to Proceed, based on the proposed detailed schedule included in Bidders submitted Section 00335 Qualification Requirements, once approved by KUB. All Bids must be made out on the bid form provided with the Bidding Documents. Each bidder must turn in a security deposit with its Bid. The deposit is five percent (5%) of the Bid amount, subject to the conditions stated in the Instructions to Bidders. A performance Bond and a payment Bond, each in the amount of 100 percent (100%) of the Contract Price, with a corporate surety approved by the OWNER, will be required for the faithful performance of the Agreement. To the extent required by state law, the OWNER shall have the right to require additional payment and performance Bonds. All communications concerning this project shall be addressed to Abbey Marshall at abbey.marshall@kub.org.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects