Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 2, 2023

December 4, 2023

April 2, 2024

To Be Determined

Renovation

No Information to Display

$200,000.00

Public - City

img_map_placeholder

To Be Determined, Etowah, AR

Subscribe to View Full Documents

The Owner reserves the right to waive any informalities or to reject any or all bids. Each bidder must deposit with his bid, security in the amount, form and subject to the conditions provided in the Information for Bidders. The Information for Bidders, Form of Bid, Form of Contract, Plans, Specifications, Forms of Bid Bond, Performance and Payment Bond, and other Contract Documents may be examined at the following locations In accordance with Act 150 of 1965, as amended, all bidders shall conform to the requirements of the Arkansas State Licensing Law for Contractors. An Arkansas Contractor's license is not required at the time of the bid submission. However, one is required at the time that the contract is signed. Contractor shall remove the existing generator at the wastewater treatment facility. This generator shall remain the property of Etowah and be delivered to Etowah for storage. The contractor shall provide and install a new generator. The contractor shall connect the generator to the existing gas supply lines and existing automatic transfer switch. It is intended that the contract shall include all materials, labor, equipment, services, etc. required for the Contract 1 - Replacement of grinder pumps, and Contract 2 - Replacement of generator at the wastewater treatment facility in Etowah, Arkansas, together with any site work and attendant facilities thereto, as shown in the Drawings and described in the Specifications prepared by Miller-Newell Engineers, Inc., 510 Third Street, Newport, AR. The Contractor will not be required to perform work that is not within the general character and scope of the Drawings and Specifications or not reasonably inferrable therefrom; however, he must recognize and accept the fact that these documents are not intended to illustrate or describe each and every possible detail of construction or finish that will be encountered in the execution of the work, nor can they show the exact location of each mechanical line, wiring device, fixture, etc. Where conditions are encountered that have not been specifically shown or detailed, they shall be worked out and finished similar to other details of like nature, or in accordance with supplementary Drawings furnished by the Engineer. It shall be the responsibility of the General Contractor to coordinate all of the various phases of the construction and finish materials, including mechanical and electrical lines and equipment, so that all of the many components will fit together and function properly without interference one to the other to the end that the entire job when completed will present a neat and finished appearance with all movable parts and mechanical and electrical equipment operating properly, ready for the Owner's use.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects