Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 23, 2023

November 23, 2023

No Information to Display

To Be Determined

Addition, Demolition, Remodeling, Site Work

No Information to Display

$2,000,000.00

Public - City

img_map_placeholder

To Be Determined, Newport, KY

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Scope of Addition of new locker room/restroom- Attached layout and existing blueprint 1. Removal of existing pantry and three pantry closets 2. Removal of existing door and relocate to side wall. 3. Removal and replacement of ceiling tiles as needed. 4. Relocation of electrical outlets/ switches/fire alarm strobes and any other electrical needs 5. Installation of lighting where needed. 6. Installation of ventilation 7. Installation of one toilet and stall 8. Installation of a double sink 9. Installation of a single shower 10. Installation and repair to any existing or new plumbing (existing OIC Bathroom Toilet) 11. Installation of floor drain 12. Installation of floor finishings 13. Installation of mirror and other fixtures Kitchen remodel- Attached layouts 1. Removal of existing cabinets upper and lower 2. Removal of existing countertops 3. Removal and replace needed ceiling tiles. 4. Paint existing ceiling grid 5. Replace all damaged drywall, studs, and any other damage found under existing finishes. 6. Replace existing plumbing where necessary. 7. Installation of new electrical outlets in appropriate locations 8. Installation of new flooring* 9. Installation of three full-length cabinets 10. Installation of new cabinetry 11. Installation of deep well sink and fixtures. 12. Installation new under-counter dishwasher 13. Installation of new industrial refrigerator* a * If the budget allows for said items The City of Newport Fire Department is accepting sealed bids for a remodeling project for a kitchen and the addition of a new locker room. If you have any questions about the bid specifications or want to inspect the project site, please call Chief Peluso at 859-292-3647. The City of Newport reserves the right to reject all bids and waive all formalities in the award of the bid.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.