Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

March 13, 2024

April 29, 2024

April 30, 2029

750 E 49th St

Demolition, New Construction, Site Work

No Information to Display

$56,000,000.00

Public - County

img_map_placeholder

750 E 49th St, Los Angeles, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

49th Street Elementary School - Major Modernization Project The proposed Project consists of new construction, reconfiguration of existing spaces, site improvements, and demolition of school facilities. The Project scope also includes interim facilities, as necessary, to accommodate the temporary displacement of any facility and its associated function during construction. Detailed Scope of Work A. New Buildings/Structures 1. 1-Story Kindergarten Classroom Building with four classrooms and associated support spaces 2. 1-Story Multi-Purpose Room/Food Services/Library Building 3. Lunch shelter 4. Covered eating area for faculty 5. Two shade structures 6. Covered walkways/arcades B. Demolition and Removal 1. 1-Story Auditorium Building 2. 1-Story West Classroom Building 3. 1-Story Cafeteria Building 4. Lunch Pavilion (attached) Proposers that are not currently prequalified by the District must submit the Prime Contractor Prequalification Questionnaire at least ten (10) business days before and must be approved at least five (5) business days prior to the Statement of Qualifications (SOQ) due date indicated on the Important Initial Information page 2 of this RFQ. The design-build budget for the design and construction of the Project, inclusive of all costs of design, engineering, construction, supervision and management, is approximately $56 million. The budget is subject to change at any time prior to award, at the sole and absolute discretion of the District, by issuance of an addendum; or at any time after the award in accordance with the terms of the design-build contract. District has established participation goals to attain twenty-five percent (25%) of the contract dollars going to certified SBE/MicroSBE and five percent (5%) going to VBE/DVBE. All Proposers shall implement policies, procedures and methods to meet these goals, which may include but not be limited to the procurement of supplies, equipment, technical services, and/or other services under this contract.

39 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.