Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 2, 2023

January 8, 2024

March 1, 2024

Multiple Locations

Site Work

No Information to Display

$1,000,000.00

Public - County

img_map_placeholder

Multiple Locations, Medicine Hat, AB

Subscribe to View Full Documents

Work involves the installation of a new bridge culvert to replace BF#78070 located 30 km south of Medicine Hat on the Black and White Trail (SE12-09-06-W4), with a new 2.4m dia. Corrugated Steel Pipe (CSP) culvert. Work also involves the installation of a new bridge culvert to replace BF#75142 located 25 km south of Medicine Hat on the Black and White Trail (NW25-09-06-W4), with a new 2.4m dia. Corrugated Steel Pipe (CSP) culvert. The scope of work for both project areas includes, but is not limited to, the following: Traffic accommodation Site isolation and care of water (if required), including Fish Capture and TSS testing Removal and disposal of the existing bridge file culvert Excavation Supply and Assembly of the new bridge file culvert Backfill including common (and potentially borrow) and granular backfill material Heavy rock riprap erosion protection including geotextile filter fabric Roadway work, including Granular Base Course and Gravel Surfacing Permanent environmental protection devices Documents can be obtained from https://mpe.bidsandtenders.ca/ Question Deadline: Fri Oct 27, 2023 12:00:00 PM (MDT)

19 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects