Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 8, 2023

December 8, 2023

August 4, 2024

4269 M-80

Renovation

No Information to Display

$412,000.00

Public - State/Provincial

img_map_placeholder

4269 M-80, Kinross Charter Township, MI

Subscribe to View Full Documents

Video Management System Upgrade Chippewa Correctional Facility PROJECT NAME AND LOCATION (INCLUDE STREET ADDRESS) Video Management System Upgrade Chippewa Correctional Facility - 4269 W. M-80, Kincheloe, MI 49784 Question Deadline 10/31/2023 at 2:00 PM ET All requests or inquiries concerning the Bidding Documents, or the Work must be addressed to Bret Emerson, Commtech Design, bids@commtechdesign.com. 5% Bid This is an upgrade of the components of the video security system. Work shall include but not be limited to: Install cabling, security cameras, network switches and servers/storage to support the new and existing cameras plus the growth factor. See specs and drawings. Replace existing camera monitoring PC's and provide new PC's as noted on the drawings and specifications. For new cameras, provide costs to include license software thru July 31, 2024. New cameras are cameras above and beyond the existing quantity of cameras. Existing cameras and cameras to be replaced already have licensing thru July 31, 2024 For new monitoring PC's provide Genetec licenses when required. Fully load the latest Genetec software on the servers and PC's and upgrade all new and existing camera software to the latest firmware that is compatible with the Genetec software. Provide full documentation and as-builts of network connectivity and camera locations and camera numbers on red-lined PDF documents. See specifications for full closeout documentation required. SEE SPECIFICATIONS TO DETERMINE WHAT SCOPE OF WORK IS PART OF THE GENETEC INTEGRATOR SCOPE (GIS) Refer to spec sections: 283601 where they include portions of the work that are to be provided and/or completed by the GIS contractor. The GIS Contractor shall be a Genetec certified Channel Partner See specifications for standards Electrical updates shall include but not be limited to: Installation of new UPS circuit in the Admin building with distribution to data rack on the second floor of the Admin building. Replacement of all existing camera UPS units in all buildings other than the Admin building. Adding new UPS units and generator circuits in areas to meet facility needs. Addition of surges suppression and grounding of all external cameras, new and existing. Addition of surge suppression in all existing Perimeter Cabinets. Directional boring and Hydrovac to new poles, camera locations, and gun range. Addition of conduit paths for new cameras from new gun range data rack. Ground Penetrating Radar shall be implemented at all underground work areas.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects