Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 27, 2023

November 27, 2023

March 26, 2024

Multiple Locations

Site Work

No Information to Display

$500,000.00

Public - County

img_map_placeholder

Multiple Locations, Houston, TX

Subscribe to View Full Documents

Construction of Water Plant No. 2 Rehabilitation Phase 1 for Fallbrook UD, Harris County, Texas The rehabilitation for the existing water plant encompasses a range of activities, including but not limited to: cleansing, power washing, abrasive blasting, and recoating the inner and outer surfaces of a one (1) 400,000-gallon Ground Storage Tank (GST), as well as two (2) 20,000-gallon Hydropneumatic Tanks (HPTs); installation of flexible waterproof mast between GST chime and foundation; sealing the HPT tank bases to concrete pedestals; applying a non-skid coating to the GST's roof, extending handrails; installation of a new internal ladder with a SAF-T climb safety rail to the GST; and installation twelve equally spaced peripheral shell vents for the GST. The rehabilitation also involves solvent cleaning followed by manual or power tool cleaning of aboveground piping and the well motor, abrasive blasting, cleaning, and recoating of booster pumps, associated piping, hatches, valves, and related components. The rehabilitation encompasses the appropriate disposal of the existing concrete board fence and installation of 8-foot wooden fence, with a three-strand barbed wire and rot board. Installation of aboveground and underground water pipes to facilitate the conveyance of surface water from the future meter station, installation of surface water inflow piping to the GST, installation of yard piping for future chemical injection of chlorine, LAS and orthophosphate, installation of yard piping to bring sample from meter run to future analyzer, installation of yard piping for future analyzer drain. The deadline to ask questions is 10/25/2023 10:00 AM CST A cashier's check or bid bond in the amount of 5% of the total bid amount must accompany each bid. The successful bidder will be required to provide performance, payment and maintenance bonds for the full amount of the contract. The Owner reserves the right to reject any or all bids.

42 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.