Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
October 27, 2023
November 27, 2023
March 26, 2024
Multiple Locations
Site Work
No Information to Display
$500,000.00
Public - County
Multiple Locations, Houston, TX
Construction of Water Plant No. 2 Rehabilitation Phase 1 for Fallbrook UD, Harris County, Texas The rehabilitation for the existing water plant encompasses a range of activities, including but not limited to: cleansing, power washing, abrasive blasting, and recoating the inner and outer surfaces of a one (1) 400,000-gallon Ground Storage Tank (GST), as well as two (2) 20,000-gallon Hydropneumatic Tanks (HPTs); installation of flexible waterproof mast between GST chime and foundation; sealing the HPT tank bases to concrete pedestals; applying a non-skid coating to the GST's roof, extending handrails; installation of a new internal ladder with a SAF-T climb safety rail to the GST; and installation twelve equally spaced peripheral shell vents for the GST. The rehabilitation also involves solvent cleaning followed by manual or power tool cleaning of aboveground piping and the well motor, abrasive blasting, cleaning, and recoating of booster pumps, associated piping, hatches, valves, and related components. The rehabilitation encompasses the appropriate disposal of the existing concrete board fence and installation of 8-foot wooden fence, with a three-strand barbed wire and rot board. Installation of aboveground and underground water pipes to facilitate the conveyance of surface water from the future meter station, installation of surface water inflow piping to the GST, installation of yard piping for future chemical injection of chlorine, LAS and orthophosphate, installation of yard piping to bring sample from meter run to future analyzer, installation of yard piping for future analyzer drain. The deadline to ask questions is 10/25/2023 10:00 AM CST A cashier's check or bid bond in the amount of 5% of the total bid amount must accompany each bid. The successful bidder will be required to provide performance, payment and maintenance bonds for the full amount of the contract. The Owner reserves the right to reject any or all bids.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Houston, TX
Bid Date: Jan 18 2024
Houston, TX
Bid Date: Oct 17 2023
Houston, TX
Bid Date: Oct 17 2023
Houston, TX
Bid Date: Oct 25 2023
Houston, TX
--
Houston, TX
Bid Date: Jan 23 2024
Houston, TX
Bid Date: Feb 01 2024
Houston, TX
--
Houston, TX
Bid Date: Oct 24 2023
Houston, TX
--
Houston, TX
Bid Date: Oct 13 2023
Houston, TX
Bid Date: Jan 08 2024
Houston, TX
--
Houston, TX
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
