Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 19, 2023

November 20, 2023

No Information to Display

4046 N Leavitt St

Asbestos Abatement, Renovation, Site Work

No Information to Display

$48,000.00

Public - City

img_map_placeholder

4046 N Leavitt St, Chicago, IL

Subscribe to View Full Documents

Coonley ES - ACM & LBP Abatement/Mitigation - Due 10/19/2023 - ONLY PREQUALIFIED POOL Environmental Contractors. Provide Labor and Materials: *ACM Abatement *LBP Mitigation 1) ACM Abatement in the basement classrooms and corridor. 2) LBP mitigation in Basement Hallway (two locations), Storage room #007A, Door #10 Vestibule, and 1st - 3 rd floor corridors. 3) Contractor to field verify dimensions and specifics of all projects listed above before placing bid. 4) Not responsible for contractor errors as a result of non-field verification. 5) Materials and installation must comply with CPS Standards and Specifications as listed on a) Section 01 56 11: General Dust, Fume and Odor Control b) Section 02 86 13: Hazardous and Universal Waste Management 6) Secure job site overnight if work is not completed in one day. 7) If building or CPS properties are damaged during construction, contractor to replace and/or repair as necessary. 8) Provide necessary labor and materials to fix/correct issues preventing any or all of the projects to be marked as completed. 9) All work shall be coordinated with the Board authorized representatives to complete in an agreed upon time frame. 10) Contractor is to remove and dispose of materials torn out and any construction debris. 11) All trash must be removed off-site by contractor. 12) Clean the surrounding area and make sure all is swept of debris. 13) All questions/requests must be received two (2) business days prior to bid closing. The proposal shall be submitted with the attached Bid Cover Sheet completed in its entirety. * Warranty information, when applicable, shall also be included & submitted. * All work to be performed during normal working hours. * If bid price is over $25,000 or more, bidder must be signatory to relevant union, per terms of the Various Trades Contract and Project Labor Agreement. * If bid price is over $75,000, you MUST include your MBE/WBE subs and relevant forms at time of bid. Questions Due Date: Oct 10th 2023, 6:30 PM CDT

13 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.