Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

October 30, 2024

No Information to Display

Multiple Locations

Paving, Site Work

No Information to Display

$9,000,000.00

Public - City

img_map_placeholder

Multiple Locations, Forney, TX

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Engineering Services - Roadway Bond Projects. The City of Forney, Texas (the "City") is requesting statements of qualifications for the Request for Qualifications ("RFQ") for Engineering Services for the Roadway Bond Projects within the City of Forney. The City is requesting proposals from qualified Professionals and hereinafter referred to as the Proposer. The Evaluation Committee ("Committee") shall short-list proposers, and the City Council shall select up to four (4) firms to complete this work. Project assignments to successful firms will be at the sole discretion of the City. Selected firms will each be assigned one (1) project. The City will negotiate with each firm to develop a scope of work and budget on a project-by-project basis. The work provided under this solicitation is anticipated to include at least the following projects: Lovers Lane (Hwy 80 to FM 740) - Upgrade Existing From Frontage Road Hwy 80 To FM 740 Length (mi) (approximately) - 1.2 FM 548 / Monitor Connector - New Construction From FM 548 To Monitor Blvd Length (mi) (approximately) - 1.0 Forney Community Park Road Extension - New Construction From Justice Center Dr To Holly Leaf Length (mi) (approximately) - 1.0 The deadline to ask questions is 10/26/2023 12:00 PM CST. All inquiries concerning this RFQ, questions, and requests for additional information shall be sent in writing via email to Candy McQuiston, Assistant Director of Engineering/CIP, cmcquiston@forneytx.gov or through electronically. Proposers are responsible for making certain that their proposal is received at the location specified by the due date and time. The City is not responsible for delays caused by any mail, package, or courier service, including the U.S. mail, or caused by any other occurrence or condition. No oral, telegraphic, electronic, facsimile, or telephonic proposals or modifications will be considered unless otherwise specified. Proposals received after the due date and time will be returned to the Proposer unopened. The projects include engineering design services for preliminary and final design, environmental clearance services, bid phase services, construction administration, and project management services. Some projects may also include utility design, Right of Way, and easement determination. Anticipated City Review and Scoring November 1, 2023 Anticipated Award Date December 5, 2023 The method of Contractor Selection has not been Determined at this time.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.