Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 9, 2024

June 6, 2024

May 16, 2025

Multiple Locations

Paving, Site Work

No Information to Display

$2,100,000.00

Public - City

img_map_placeholder

Multiple Locations, Des Moines, IA

160

9

4

Subscribe to View Full Documents

2025 Neighborhood Sidewalk Program The City of Des Moines, hereinafter called the Jurisdiction, has need of a qualified contractor to complete the work comprising the below referenced improvement. The undersigned Bidder hereby proposes to complete the work comprising the below referenced improvements or project as specified in the contract documents, which are officially on file with the Jurisdiction, in the Des Moines City Engineers Office, at the prices hereinafter provided in Part C of this Proposal, for the following described improvements: 2024 Neighborhood Sidewalk Program Contract 1, 092023004 The improvement includes construction of Portland Cement Concrete (PCC) sidewalk, PCC ADA compliant curb ramps, grading, pavement removal, subdrain, storm sewer, modular block retaining walls, water service modifications, surface restoration, traffic control, and other incidental items, all in accordance with the contract documents, including Plan File No. 659-222/379, along the following sections of residential streets in Des Moines, Iowa: E. Tiffin Avenue (North Union Street to E. 12th Street, south side) 62nd Street (University Avenue to Clark Street, east side) Clark Street (8th Street to 9th Street, south side) S.E. 5th Street (E. Livingston Avenue to E. Granger Avenue, east side) S.E. 6th Street (Indianola Avenue to Pioneer Road, west side) Kenyon Avenue (S.W. 9th Street to S.W. 14th Street, north side). This project shall be fully completed not later than May 16, 2025, and in accordance with the Completion Provisions. Engineer's Construction Estimate. $2,100,000.00

24 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects