Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

December 5, 2023

February 5, 2024

July 29, 2025

Multiple Locations

Paving, Site Work

No Information to Display

$12,565,465.00

Public - City

img_map_placeholder

Multiple Locations, Schertz, TX

Subscribe to View Full Documents

The intended scope of work (the "Work") includes, but is not necessarily limited to, the construction of a lift station (the "Schertz Lift Station") with a firm capacity of 9.8 million gallons per day ("MGD") and a future expansion capability to approximately 22 MGD; and inclusive of four (4) submersible pumps (3 duty + 1 standby) to CCMA's existing lift station at the site. The Work is inclusive of yard piping, electrical, grading, concrete pavement, site improvements, a bridge crane, and decommissioning of the existing lift station. The Work also includes the installation of approximately 3,700 linear feet of 48-inch diameter fiberglass reinforced pipe (FRP) wastewater line to replace the existing gravity mains. The pipeline will be tunneled to cross two thoroughfares: Farm to Market ("FM") 78, which is a Texas Department of Transportation (TxDOT) Right of Way (ROW), and the Union Pacific Railroad. The gravity line will include the installation of eleven (11) 72-inch diameter concrete manholes, two (2) 48-inch diameter concrete manholes, one (1) 144-inch diameter concrete manhole, and one (1) 84-inch diameter concrete manhole. This Work also includes the installation of approximately 411 linear feet of 8-inch Polyvinyl Chloride (PVC) main which crosses a City of Schertz drainage channel, installation of laterals and interceptor tie-ins ranging in size from 8-inch to 24-inch, and in-place abandonment of the existing 42-inch, 27-inch and 15-inch wastewater lines and associated manholes. Question Deadline 11/22/2023 at 5:00 PM CT Respondents should submit any and all questions in writing to Plummer Associates, Inc. (Engineer) electronically through CIVCAST. However, questions regarding the design of the Project shall be sent to the attention of Amy Middleton through CIVCAST

56 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.