Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 8, 2023

December 8, 2023

October 3, 2024

Multiple Locations

Site Work

No Information to Display

$200,000.00

Public - City

img_map_placeholder

Multiple Locations, Perryville, MO

Subscribe to View Full Documents

The Northeast Outfall Sewer Replacement Phase III project, located in Perryville, Missouri, consisting of 15" to 30" sanitary sewer main piping, manholes, rock excavation, steel casing pipe, seeding/strawing, and other related construction FB#: 425 & 425A The City of Perryville (Owner) reserves the right to waive any informalities or irregularities or to reject any or all bids and to accept the one that in the judgment of the Board of Aldermen is the lowest responsive, responsible bidder. The Contractor will be paid in accordance with the provisions in the General Conditions PART OF SECTION 18, U.S. SURVEYS 2129 & 846

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects