Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 2, 2023

March 4, 2024

No Information to Display

I-215

Paving, Site Work

No Information to Display

$500,000.00

Public - City

img_map_placeholder

I-215, Henderson, NV

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The I-215 Beltway Widening consists of the widening of I-215 between Pecos/St. Rose and Stephanie from 3 to 5 lanes with auxiliary lanes between interchanges, and interchange and arterial improvements at Pecos Road/St. Rose Parkway and Green Valley Parkway. The Project will also reconstruct ramps at the Valle Verde Drive and Stephanie Street interchanges. Scope of Services: The scope of services requested consists of but are not limited to construction management services including inspection of roadway construction, administration of field and laboratory testing for roadway construction, document control, and other roadway construction contract administration services. Appropriate vehicles, iPads, cell phones, and proper safety equipment shall be supplied for all personnel assigned to this project. A final scope of work will be prepared by the selected firm. Statement of Qualifications (SOQ) Content: SOQs shall be limited to no more than fifteen (15) single sided 8 1/2 -inch by 11-inch sheets, excluding the cover. An 11-inch by 17-inch sheet of paper may be utilized to illustrate a firm's organizational chart as necessary. The I-215 Beltway Widening consists of the widening of I-215 between Pecos/St. Rose and Stephanie from 3 to 5 lanes with auxiliary lanes between interchanges, and interchange and arterial improvements at Pecos Road/St. Rose Parkway and Green Valley Parkway. The Project will also reconstruct ramps at the Valle Verde Drive and Stephanie Street interchanges. Scope of Services: The scope of services requested consists of but are not limited to construction management services including inspection of roadway construction, administration of field and laboratory testing for roadway construction, document control, and other roadway construction contract administration services. Appropriate vehicles, iPads, cell phones, and proper safety equipment shall be supplied for all personnel assigned to this project. A final scope of work will be prepared by the selected firm. Statement of Qualifications (SOQ) Content: SOQs shall be limited to no more than fifteen (15) single sided 8 1/2-inch by 11-inch sheets, excluding the cover. An 11-inch by 17-inch sheet of paper may be utilized to illustrate a firm's organizational chart as necessary. Question Cuttoff Date & Time 10/25/2023 08:00:00 PM (ET) The CITY reserves the right to sole evaluation of the SOQs, should the CITY deem it to be in its best interest.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.