Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 27, 2023

November 27, 2023

June 1, 2024

S Lake Shore Dr & Wooddale Dr

Site Work

No Information to Display

$40,000.00

Public - City

img_map_placeholder

S Lake Shore Dr & Wooddale Dr, Linn, WI

Subscribe to View Full Documents

The Scope of Work Consists of Repairs to the Concrete Box Culverts Inlets, Outlets, and Stabilization Work. The Box Culvert is Located Just West of the S Lakeshore Dr. / Wooddale Dr. Intersection. Bids Must Be Valid Until at Least the End of 2023. For Questions, Contact Highway Superintendent Matt Wittum at Linnhighway@townoflinn.wi.gov or 262-275-6300 Ext. 17. The scope of work consists of the repair of spalling concrete in an existing box culvert, the installation of a new concrete apron and cut-off wall on the outlet of the culvert, and the installation of rip rap on both sides of the culvert located approximately 85 feet west of the intersection of Wooddale Drive and S. Lake Shore Drive, Lake Geneva, WI 53147. Erosion control and dewatering will be required as part of the project. Work is to be completed as soon as possible before the end of the 2023 construction season. The scope of work consists of the repair of spalling concrete in an existing box culvert, the installation of a new concrete apron and cut-off wall on the outlet of the culvert, and the installation of rip rap on both sides of the culvert located approximately 85 feet west of the intersection of Wooddale Drive and S. Lake Shore Drive, Lake Geneva, WI 53147. Erosion control and dewatering will be required as part of the project. Work is to be completed as soon as possible before the end of the 2023 construction season. It is the intention of the Town is to repair the existing box culvert located approximately 85 feet west of the intersection of Wooddale Drive and S. Lake Shore Drive, Lake Geneva, WI 53147 and install an apron to prevent erosion of the streambed. In general, the project involves concrete repair, concrete apron construction, rip rap installation, erosion control installation at the existing concrete box culvert. SCOPE OF WORK The CONTRACTOR agrees to furnish all the labor, tools, materials and equipment necessary to complete in every detail the repair of the existing box culvert and the installation of the apron and riprap while providing adequate erosion control measures and dewatering. All excavated spoils are to be removed from site. Proper protective equipment is required, as well as coordination with any applicable utility companies. The project is located as shown on the Drawings. Perform work under this contract for Wooddale Box Culvert as the plans show and execute the work as specified in the State of Wisconsin, Department of Transportation, Standard Specifications for Highway and Structure Construction, 2023 Edition as published by the department, and these special provisions. These special provisions and other documents in the Project Manual take precedence over any conflicting provision in Section 100 of the State of Wisconsin, Department of Transportation, Standard Specifications for Highway and Structure Construction, 2023 Edition.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects