Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
October 16, 2023
October 17, 2023
December 30, 2023
700 Capital Ave
Site Work
No Information to Display
$388,195.00
Public - State/Provincial
700 Capital Ave, Frankfort, KY
For the Governor's Inauguration, temporary exterior platforms are erected in front of the State Capitol to provide accommodations for speakers, VIP's and other guests. The project drawings show the overall design intent, size, location, layout and configuration of the temporary outdoor platforms desired for the inauguration ceremonies. The temporary platforms will be erected for less than 30 days. Steel scaffolding will be used to create the platform structures. The platform supplier will be required to provide engineered shop drawings detailing platform supports, decks, stairs, ramps, railings, guards and other platform components. Platform structures will be built from modular scaffolding systems which can vary in size and configuration between manufacturers. The architectural drawings are intended to allow different manufacturers and suppliers to propose their proprietary systems to meet the inauguration platforms general design intent. Details of construction will be the responsibility of the vendor/supplier and will be documented under a separate submittal following selection of the vendor/supplier. The Work of Project is defined by the Contract Documents and consists of the following: 1. Scaffolding, wood framing, floor deck, stairs, ramps, guards, railing, fabric skirts and other Work necessary to furnish, install and remove Governoris inauguration platforms and bleacher riser seating as indicated in the Contract Documents.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Frankfort, KY
Bid Date: Oct 05 2023
Frankfort, KY
Bid Date: Oct 12 2023
Frankfort, KY
Bid Date: Oct 12 2023
Frankfort, KY
Bid Date: Oct 17 2023
Frankfort, KY
Bid Date: Oct 26 2023
Frankfort, KY
Bid Date: Oct 16 2023
Frankfort, KY
Bid Date: Nov 21 2023
Frankfort, KY
Bid Date: Oct 25 2023
Frankfort, KY
Bid Date: Oct 23 2023
Frankfort, KY
Bid Date: Aug 15 2023
Frankfort, KY
Bid Date: Aug 18 2023
Frankfort, KY
Bid Date: Aug 18 2023
Frankfort, KY
Bid Date: Sep 06 2023
Frankfort, KY
Bid Date: Sep 06 2023
Frankfort, KY
Bid Date: Sep 07 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
