Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 16, 2023

October 17, 2023

December 30, 2023

700 Capital Ave

Site Work

No Information to Display

$388,195.00

Public - State/Provincial

img_map_placeholder

700 Capital Ave, Frankfort, KY

Subscribe to View Full Documents

For the Governor's Inauguration, temporary exterior platforms are erected in front of the State Capitol to provide accommodations for speakers, VIP's and other guests. The project drawings show the overall design intent, size, location, layout and configuration of the temporary outdoor platforms desired for the inauguration ceremonies. The temporary platforms will be erected for less than 30 days. Steel scaffolding will be used to create the platform structures. The platform supplier will be required to provide engineered shop drawings detailing platform supports, decks, stairs, ramps, railings, guards and other platform components. Platform structures will be built from modular scaffolding systems which can vary in size and configuration between manufacturers. The architectural drawings are intended to allow different manufacturers and suppliers to propose their proprietary systems to meet the inauguration platforms general design intent. Details of construction will be the responsibility of the vendor/supplier and will be documented under a separate submittal following selection of the vendor/supplier. The Work of Project is defined by the Contract Documents and consists of the following: 1. Scaffolding, wood framing, floor deck, stairs, ramps, guards, railing, fabric skirts and other Work necessary to furnish, install and remove Governoris inauguration platforms and bleacher riser seating as indicated in the Contract Documents.

17 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects